Oil and gas contracting scope
Industrial oil and gas work requires coordination between technical disciplines, procurement, civil works, mechanical activities, electrical and instrumentation systems, quality control and HSE. Contractor selection should assess the contract-specific scope and verifiable references rather than a general label. The company's published portfolio includes pipelines and auxiliary facilities for a gas-injection project.
Relevant service capabilities
- Coordination of engineering, procurement and construction activities within the agreed project scope
- Material and equipment sourcing with project-specific quality checks
- Civil and industrial facilities work involving mechanical, electrical and instrumentation interfaces when contracted
- Testing, pre-commissioning and trial operation for the defined work packages
Published oil and gas project references
The following references describe the recorded contract scope, not responsibility for an entire complex.
Ahvaz–Bahregan oil pipeline
A 134 km, 36-inch pipeline under a PC contract, including procurement, cathodic protection, testing and trial operation in the published record.
Aghajari gas-injection project: water transfer line
First phase of a drilling-water transfer line under an EPC contract, covering route studies, cathodic protection, hydrostatic testing and commissioning.
Aghajari gas-injection project: auxiliary buildings
Drawings, materials, civil construction, equipment procurement and installation, commissioning and defect remediation within the stated package.
Understanding EPC and PC contract models
An EPC agreement defines engineering, procurement and construction responsibilities in an integrated arrangement. A PC contract covers procurement and construction, while engineering obligations may be defined separately. Comparing actual contractual scope makes project references more meaningful for buyers.
Questions from industrial clients
Does Takvin Sanat have oil and gas references?
Yes. The published record includes the Ahvaz–Bahregan pipeline and packages associated with the Aghajari gas-injection project.
Were all referenced projects EPC contracts?
No. The Ahvaz–Bahregan pipeline is listed under PC, while the first phase of Aghajari's water transfer line is listed under EPC.
What should be included in a contracting request?
Define technical deliverables, procurement responsibilities, site scope, schedule, HSE expectations, testing and handover criteria.